ERMA FIRST
ERMA FIRST BWTS FIT is a 2 stage, filtration and electro-chlorination, full flow Ballast Water Treatment System, designed especially for the demanding Newbuilding / Retrofit markets where space limitation, efficient performance in challenging conditions, flexibility in installation and capital cost are the key issues that a BWTS would have to satisfy.
The system is certified to operate in deepsea, brackish & fresh water (0.9 PSU), has a very small footprint, competitively priced, is comprised of European and US origin components and operates only during ballasting and is suitable for ballast-pump capacities ranging from 50 to 3,740 cbm/hr. per pump. Higher flows are achievably by scaling.
High End Filtration (Separation) | Advanced Electrolysis (Disinfection) |
---|---|
Filtration Grade: >40μm | Electrodes lifetime exceed 5000 operational hrs |
Pressure Drop: 0.05 – 0.5 bar | Fresh Water operation according to IMO & USCG Standards |
Capacity: 50~3740 m3/h | Small Footprint |
Installation Position: Vertical / Horizontal | Very low Hydrogen production |
Explosion proof type available | Made in Sweden |
Temperature: -10 to 50oC | Negligible Pressure Loss |